|
NAME
OF THE PROJECT:
P.S.SRIJAN
SONARGAON
321,
SONARPUR STATION, KUMRAKHALI, KOLKATA 103.
LOCATION
(INCLUDING ADDRESS, LAND MARK, HOW TO REACH,
CONNECITVITY ETC.):
SONARPUR
STATION ROAD OFF KARBALA PLAY GROUND.
THE
PROJECT VERY CLOSE TO THE PROPOSED 8- LANE SUPER
EXPRESS E.M. BYPASS WHICH WILL EXTENDING TO BARUIPUR
AND JUST 10 MINS FROM THE UPCOMING GARIA METRO
STATION, WHICH MAKES IT DIRECTLY CONNECTED TO
TOLLYGUNGE, JADAVPUR, GARIAHAT, BALLYGUNGE, PARK
STREET, ESPLANADE, DALHOUSIE, SALT LAKE, ULTADANGA,
AIRPORT.
HOWRAH
STATION: 60 MINS.
SEALDAH
STATION: 45 MINS.
AIRPORT:
45MINS
PROMOTER
& CREDENTIAL (WITH OFFICE ADDRESS):
36/1A
ELGIN ROAD KOLKATA- 20
P.S.
GROUP
SHERWOOD
ESTATE AT NARENDRAPUR; TRINITY TOWERS AT PARK CIRCUS
– SCIENCE CITY BYPASS CONNECTOR, CLASSICA AT SARAT
BOSE RD., NATURE NEST AT JADAVPUR AND MANY MORE.
SRIJAN
PROJECTS PVT.LTD.
SRIJAN
PROJECTS - SHERWOOD ESTATE AT NARENDRAPUR: TRINITY
PLAZA ON PARK CIRCUS – SCIENCE CITY BYPASS
CONNECTOR: PARKSIDE RESIDENCY AT MOULALI, HERITAGE
SRIJAN TOWERS AT MANIKTALA: CLASSICA ON SARAT BOSE
ROAD: CRYSTAL SPRING AT SHAKHER BAZAR: HERITAGE
SRIJAN PARK AT DARGA ROAD: SRIJAN HERITAGE HEIGHTS
AT S.P. MUKHERJEE ROAD, AND 19, LAKE PLACE AND MANY
MORE.
ARCHITECT &
CREDENTIAL
MR.
VINNU CHADDA:
DESIGN
CELL; 2A, COOPER STREET, KOLKATA - 700026
SOME
OF THE PROJECTS: COMMERCIAL PROJECT AT CAMAC STREET,
MALL & MULTIPLEX AT DIAMOND CITY NORTH, HOUSING
PROJECT AT BEHALA, FOOD PARK & MALL FOR HALDIRAM
IN BALLYGUNGE, SCHOOL PROJECT AT TOPSIA.
SBP:
23%
TOTAL
LAND AREA: 129 KOTTAHS
GROUND
COVERAGE: 39%
NO.
OF BLOCKS: FOUR (G+5), ONE (G+4)
NO.
OF FLATS: 168
FLAT
SIZES:
1
B/R – 556-678 SQ.FT; 2 B/R - 762- 1069 SQ. FT; 3
B/R – 1090 – 1378 SQ.FT.
PROCESS
OF BOOKING:
RS.51,
000/-(APPLICATION MONEY & BALANCE AS PER
SCHEDULE)
20%
ON AGREEMENT (WITHIN 10 DAYS FROM THE DATE OF
APPLICATION INCLUSIVE OF 51,000 OF APPLICATION
MONEY)
10%
ON OR BEFORE FOUNDATION
10%
ON OR BEFORE GROUND FLOOR CASTING
10%
ON OR BEFORE 1ST FLOOR ROOF CASTING
10%
ON OR BEFORE 2ND FLOOR ROOF CASTING
10%
ON OR BEFORE 3RD FLOOR ROOF CASTING
10%
ON OR BEFORE 4TH FLOOR ROOF CASTING
5%
ON COMPLETION OF BRICK WALL
5%
ON COMPLETION OF PLASTER OF THE SAID FLAT.
10%
ON POSSESSION
EXTRA
CHARGES:
MANDATORY
GENERATOR
CHARGES
1 B/R RS. 15000 FOR .50 KVA
2 B/R RS 20,000 FOR .75 KVA
3 B/R RS 25,000 FOR 1 KVA
ELECTRICAL
AND TRANSFORMER CHARGES RS 33 PER SQ.FT.
(METER
DEPOSIT AT EXTRA COST)
LEGAL
CHARGES: RS 11000/
(RS 5500 AT THE TIME OF AGREEMENT AND RS 5500 AT THE
TIME OF POSSESSION)
GRILL
ONLY ON WINDOW MANDATORY AT EXTRA COST AT THE TIME
OF 4TH FLOOR ROOF CASTING.
DEPOSIT
MAINTENANCE
DEPOSIT RS. 16 PER SQ.FT. OF BUILT-UP AREA
DEPOSIT
FOR RATES AND TAXES RS. 8 PER SQ.FT.
OF BUILT-UP AREA
STARTING TIME:
FEBRUARY
2007
COMPLETION
TIME:
DECEMBER
2009
FACILITY:
AC
COMMUNITY HALL
GYM
AND INDOOR GAMES ROOM
INTERCOM
WATER
FILTRATION.
SPECIFICATION
DOORS
DECORATIVE
MAIN DOOR
OTHER
ENAMEL PAINTED FLUSH DOOR
FLOORS
VITRIFIED
TILES IN BED ROOM / LIVING AND DINING ROOM
ANTISKID
CERAMIC TILES IN KITCHEN AND TOILET
MARBLE/VITRIFIED
TILES IN GROUND LOBBY
MARBLE
WITH KOTA STONE IN STAIRCASE
BATHROOM
FITTINGS
WHITE
SANITARY WARE AND CP FITTINGS OF REPUTED MAKE.
HOT
AND COLD WATER SYSTEM
CERAMIC
TILES UP TO DOOR HIGHT
KITCHEN
GRANITE
TOP COUNTER WITH STAINLESS STEEL SINK.
CERAMIC
TILES UPTO 2 FEET ABOVE KITCHEN PLATFORM.
ELECTRICAL
CONCEALED
COPPER WIRINING
MODULAR
SWITCHES
TELEPHONE
LINES IN EACH BED ROOM AND LIVING ROOM
AC
POINT IN MASTER BED ROOM
WALL
PLASTER
OF PARIS FINISH.
BANK
APPROVAL:
UNDER
PROCESS
DOWN
PAYMENTS DISCOUNT:
5%
ON NOT DUE AMOUNT.
REGISTRATION
CHARGES:
7.1%
(APPROX)
SERVANT
QUARTER, IF ANY:
NOT
AVAILABLE, TO BE DECIDED AT LATER STAGE.
CONTACT
PERSON AT SITE & SITE PHONE NO. & MOBILE NO.
IF ANY:
Sourav Chowdhury - 98302 12121
|